Typical case
Create high-quality products, cast high-quality enterprise image
EPC general contracting renovation
| EPC general contracting renovation project | Project implementation time |
| Everbright Environmental Protection Energy (Jiangyin) Co., Ltd. 3 × 400T/D Waste Incineration Boiler Steam Soot Blowing System Renovation EPC General Package | 2013 |
| Dongying Yellow River Delta Sanfeng Ecological Energy Co., Ltd. Waste Heat Boiler Steam Soot Blower System Renovation EPC General Contractor | 2017 |
| China Salt Red Sifang Anhui Co., Ltd. 3*130 T/H 2*320 T/H Boiler Steam Soot Blower System Renovation EPC General Package | 2017 |
| Shenzhen Energy Environmental Protection Co., Ltd., EPC General Contractor for Transformation of Steam Soot Blower System of Waste Heat Boiler in Baoan Waste Power Plant | 2017 |
| Beikong Green Haileng Environmental Protection Co., Ltd., EPC General Contractor for Retrofitting Soot Blower of 3 × 600T/D Waste Incineration Boiler | 2019 |
Contact Us
Telephone:86-27-81887676
E-mail :sanyu9@163.com
Address:NO.7 Happiness Industrial Park,Economic &Technological DevelopmentZone(Hannan),Wuhan, PRC
Mobile Access
Copyright©2024 Wuhan Sanyu Machinery Co., Ltd. This website supports IPV6 access
SAF Coolest v1.3.1.2 设置面板 MSISD-ZFXZ-WDXZE-ZQX
图片ALT信息: WUHAN SANYU MACHINERY CO., LTD
违禁词: First, most, leading, unique, king, dragon head, leader, extreme,
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or returnHome Page